From electronto intelligence
AI is no longer a promise on the horizon, it is a force already at work, everywhere at once. The data center is the factory of this new era: its raw material is the electron, its finished product is intelligence. But the revolution is hitting a hard physical limit: AI moves in weeks, the grid moves in decades.
Get in touchWedevelop,buildandoperateon-site-poweredcomputeinfrastructure,fastandatscale,behindEurope'sAI.
From Electron to AI Factory
Our AI factories plug into power that exists today — on-site generation from biomass, hydro, solar or wind, firmed by storage and backed by the grid.
A hybrid model built for speed
We reach power two ways:
- Behind-the-meter generation co-developed with independent power producers.
- Brownfield sites with live substations and existing grid connections.
Either way, we skip the multi-year connection queue. One site, three layers: energy, data center, compute. That's how CalCore rewrites the playbook to unlock the capacity neoclouds and AI labs need to train and deploy at scale.
Electron Generation
IPP and industrial power
Site Secured
Grid, land and permits activated
AI Factory Built
High-density, modular, compute-ready
Customer Runs Compute
AI Labs and Neoclouds
Our First Pilot
NRD 1
Located within a large-scale factory.On site power generation.
2026
Ready to Build
2027 → 25MW
Ready For Service
Off grid
2029 → 50MW
Ready For Service
Grid-connected
2030 → 130MW
Ready For Service
Full AI factory
Our Pipeline
+450MW
and more to come
Get in touch
We re building AI factories where stranded power resides and verticalizing the stack from the electron to the token, we are delivering the foundation for Europe's AI future.