Our process from Power To Compute

Partner with us

01

Originate

Our power-first approach is built on a rigorous identification and assessment of assets with near-term power access. From solar, wind, biomass, gas, hydro, BESS or traditional grid connections, we leverage existing or soon-to-come power generation or storage capacity.

Our power-first
approach

Fast & clean

Grid-resilient and decarbonized

Grid, biomass, hydro, on-site generation, industrial waste heat - we design each site around whatever capacity is already there and unspoken for. That's how we energise in Europe without waiting for the grid queue, in the cleanest way possible.

Coordinated development

Energy developers have sites, permits and megawatts. Through JV or acquisition, we make the most of such sites and bring the missing piece - power and construction expertise - to turn them into AI factories.

Optimized

Low cost

We structure deals to protect margins, through behind-the-meter PPAs, joint ventures and M&A.

Grid-positive contracting

We sign long-term power contracts. This guarantees a buyer for new plants, so they can get built and financed without queuing for new grid capacity and pushing costs onto local ratepayers.

No energy wasted

We co-locate generation, storage and compute on the same site. Power that would otherwise be curtailed or lost in transmission goes straight into AI workloads.

NRD#1 the first off-grid AI factory in Europe

Powered by biomass & backed-up by gas.

Explore our pipeline
Location
France, Normandy
Delivery
December 2027
Power
22 MW (first phase)