Our process from Power To Compute
Partner with us
01
Originate
Our power-first approach is built on a rigorous identification and assessment of assets with near-term power access. From solar, wind, biomass, gas, hydro, BESS or traditional grid connections, we leverage existing or soon-to-come power generation or storage capacity.
Our power-first
approach
Fast & clean
Grid-resilient and decarbonized
Grid, biomass, hydro, on-site generation, industrial waste heat - we design each site around whatever capacity is already there and unspoken for. That's how we energise in Europe without waiting for the grid queue, in the cleanest way possible.
Coordinated development
Energy developers have sites, permits and megawatts. Through JV or acquisition, we make the most of such sites and bring the missing piece - power and construction expertise - to turn them into AI factories.
Optimized
Low cost
We structure deals to protect margins, through behind-the-meter PPAs, joint ventures and M&A.
Grid-positive contracting
We sign long-term power contracts. This guarantees a buyer for new plants, so they can get built and financed without queuing for new grid capacity and pushing costs onto local ratepayers.
No energy wasted
We co-locate generation, storage and compute on the same site. Power that would otherwise be curtailed or lost in transmission goes straight into AI workloads.
NRD#1 the first off-grid AI factory in Europe
Powered by biomass & backed-up by gas.
- Location
- France, Normandy
- Delivery
- December 2027
- Power
- 22 MW (first phase)